Flood defence facility refurbished by Jet Aire

Working in conjunction with JBA Consulting, Jet Aire were asked to undertake a CCTV condition survey of the outfall pipe at Lendall Pump Station, a flood defence facility near Drax Power Station, in the summer of 2013. As a result of the survey, a number of cracks were noted along the 1500mm outfall pipe. Due to the diameter of the pipe, installing a series of patch repairs was not an option. Similarly, because the outfall pipe was on the side of the River Ouse, which is tidal, therefore the installation of a full-length liner would have been very difficult and expensive. As such it was decided to install a series of internal joint seals. The latter consist of a heavy-duty rubber band, which are either 280mm or 480mm in width and is secured to the internal face of the pipe by a metal band, either side of the rubber. The metal bands are stretched by a hydraulic jacking system, with shims inserted until the optimum pressure is achieved, which ensures that the rubber is secured and will not move.

The installation at Lendall required a team that had been trained in high-risk confined space entry, because of the access issues with the outfall pipe. In addition, the work could only take place when tidal conditions allowed. The River Ouse has low and high tide times and these were monitored, so that the team could enter when the longest free pocket of time was available. Even with the team taking advantage of the best times, the complete installation took 4 days.

Internal band seals tend to be used in larger diameter pipes, where the installation of traditional patches is unsuitable or not possible.

Jet Aire managing director, Charlie Kirk, said: “This contract is a reflection of Jet Aire’s position as one of the few drainage contractors in the north with the service capability to carry out this type of work, which involves a higher level of risk and demands specialist expertise which can only be provided by highly qualified and experienced engineers. Our site work is always planned in accordance with local conditions and environmental sensitivities – it’s rarely nine-to-five and the tide-based programme at Lendall Pump Station is a great example of Jet Aire’s operational flexibility.”

Andrew Thomas of JBA Consulting said: “The continuous operation of Lendall Pump Station is essential to safeguard against flood risk in the local area. We are pleased to have managed the smooth completion of its refurbishment with assistance from Jet Aire, who were very easy to deal with and very efficient in supplying all the information, reporting and relevant documentation needed for the environmental assessment.”

Back to Case Studies

Fleet

Drain Care FleetDrain Care FleetDrain Care FleetDrain Care Fleet

Why choose Jet Aire ?

  • Over 25 years experience
  • Qualified engineers
  • Constructionline Approved
  • Competitive prices
  • RASWA trained
  • Confined Space trained
  • CHAS approved
  • Safecontractor approved
  • Modern fleet of vehicles
  • ISO9001 certified
  • 24 / 7 Day Service
  • Cutting edge technology
  • Proven track record
  • Enviable client list
  • Local authority approved
  • WTI OS19X trained

Our Clients

Balfour Beatty Yorkshire Water Marks & Spencer NHS ASDA Northumbrian Water Persimmon Homes Highways Agency HM Prison Service Bovis Homes Seymour

Latest news

15/06/2017 It’s always very pleasing to get positive feedback from customers. W... Read more>
24/05/2017 Jet Aire are delighted to continue our support for a popular community... Read more>
24/05/2017 Jet Aire are delighted to announce that we have appointed Simon Lawt... Read more>

Quick contact

Need shoring equipment?

visit our sister companyshorthe north's leading provider
jet-aire

Download brochure

PDF /CLICK HERE